Contact | Home

Commercial Case Studies


 

You may also want to read:

 


For more information please call us on 01275 461800 or complete our contact form.


Glastonbury project

The Glastonbury Project

Michael Eavis - founder of the Glastonbury Festival, at Pilton in Somerse has worked with Solarsense to build what is currently the largest privately owned solar PV array in the UK.

Click the link below for on-going updates on the progress of this fascinating project.

View Case Study View case study

Duchy of Cornwall, Tetbury
Client Duchy of Cornwall, Tetbury
Category Commercial
System Solar PV, 99.64 kWp
Completed June 2011
Summary Over 400 British-made, all-black solar PV modules on the farm building will allow the Duchy of Cornwall to save almost 50 tonnes of CO2 emissions each year...

View Case Study View case study

New Montgomery Primary School
Client New Montgomery Primary School
Category Commercial
System 167.79kWp solar PV
Completed October 2011
Summary The solar array combined with the German Passivhaus building design make this the first school in the UK to be zero carbon in use.

View Case Study View case study

National Composites Centre Bristol
Client National Composites Centre Bristol
Category Commercial
System Solar PV, 138.46 kWp
Completed April 2011
Summary The first of its kind National Composites Centre is one of the first industrial buildings in UK to achieve BREEAM Excellent rating with the help of a large solar PV array...

View Case Study View case study

Vassall Centre Trust
Client Vassall Centre Trust
Category Commercial
System 12.6 kWp solar PV
Completed March 2009
Summary Roof-mounted array on the award-winning Vassall Centre, Bristol

View Case Study View case study

King Alfred School
Client King Alfred School
Category Commercial
System 3.4 kWp solar PV
Completed
Summary Solar PV Array on curved school roof

View Case Study View case study

Cirencester Fire Station
Client Cirencester Fire Station
Category Commercial
System 10.08 kWp solar PV
Completed July 2009
Summary Solar PV array of hybrid modules on bespoke frame for flat roof of Fire Station

View Case Study View case study

Clifton Lido
Client Clifton Lido
Category Commercial
System 80 m2 solar thermal
Completed October 2008
Summary Award winning Thermomax installation powers heating for refurbished Lido pool and hot tub

View Case Study View case study

Oldfield Surgery, Bath
Client Oldfield Surgery, Bath
Category Commercial
System 23.04 kWp solar PV
Completed Jan 2011
Summary The largest solar rooftop array on a UK medical centre, so far....

View Case Study View case study

Mr & Mrs Bell
Client Mr & Mrs Bell
Category Commercial
System Dual system, 3 m2 solar thermal & 3.96kWp solar PV
Completed 18/06/2010
Summary

A dual solar thermal and solar PV system gets the best of both worlds in sunny Clevedon.

View Case Study View case study

The Tobacco Factory
Client The Tobacco Factory
Category Commercial
System Solar PV, 25 kWp
Completed Feb 2011
Summary A frame-mounted array on a flat roof overlooking the river by the Hotwells entrance to Bristol.

View Case Study View case study

Back Back | Top top

 



Solarsense trade associations and awards

Home | About Us | Solar PV | Solar Thermal | Solar Commercial | Feed-in tariff | News | Contact | Admin | Sitemap


© Solarsense 2008-2012. All rights reserved. | Web design by Severn Design Ltd